Construction estimation that spots missing scope

Know what your build will costbefore you commit.

Upload your drawings. Within 24 hours you receive a full cost estimate, material quantities and the risks to watch, checked by a chartered structural engineer.

Fixed fee per project24 hour turnaroundEngineer reviewed

Contractor, estimator or developer? Book a discussion with us →

1 · UploadStep 1 of 4

Drop in your planning or architect's drawings: PDF, scans or CAD exports.

Site & floor plans
Elevations & sections
Specification notes (optional)
2 · ReadReading drawings
Floor plan scaled at 1:100
Walls, openings & roof identified
Specification notes extracted
Cross-checking against regulations…
3 · QuantifyMaterials
Foundations (concrete)9.6 m³
Cavity blockwork74 m²
Insulation108 m²
Flat roof (warm deck)34 m²
Glazing & doors14.5 m²
Steel beam over opening1 no · 4.8 m
+ 38 further line items→
4 · ReportReady
ESTIMATED BUILD COST
€84,000 to €96,000
44 line items3 risks flagged
4.8 m opening needs a structural steel design
Drainage route not shown. Ask your builder to price it
32 m² is within the 40 m² exempt limit (conditions apply)

Illustrative example · single-storey rear extension

Recognised & supported by
Supported by Enterprise Ireland
InterTradeIreland Seedcorn Investor Readiness Competition 2026, Regional Finalist
InterTradeIreland Seedcorn 2026Regional Finalist
The National Startup Awards 2026, AI-Focused Startup, National Finalist
National Startup Awards 2026AI-Focused Startup · National Finalist
Engineers Ireland, Chartered Engineer (CEng)The Institution of Structural Engineers (IStructE)
Chartered engineer ledCEng · IStructE
Two ways to work with us

Built for the person paying for the build, and the people pricing it.

Homeowners & self-builders

A clear cost picture, in a day.

New build, extension, renovation or restoration. Understand the likely cost, materials and risks before you sign with a builder.

  • Itemised cost estimate and material quantities
  • Risks and gaps in plain English, and what to ask your builder
  • Compare quotes against one consistent scope
€450 per project
Start my analysis
Contractors · Estimators · Developers

Price more work, with the gaps already found.

Estimating, takeoff, tender preparation and commercial control, set up around how your team works. From one live tender to a full pipeline.

  • Quantities and scope gaps from your tender documents
  • Pro plans for estimating teams; Enterprise for developers and main contractors
  • Send us a past project and we'll validate it against your own numbers before we talk
How it works

From drawings to decisions in four steps.

The platform does the reading, measuring and checking. A chartered engineer reviews what matters. You get a report you can act on.

01

Register & upload

Create your account and upload the drawings you have: planning, tender or construction issue.

02

We read the drawings

The platform identifies elements, measures quantities and extracts specification notes.

03

We check for risk

Missing information, conflicts and regulatory points are flagged, then reviewed by an engineer.

04

Your report

Cost estimate, quantities and risks, usually within 24 hours of submission.

What you receive

One report. Everything you need before you commit.

Likely build cost

An itemised estimate range based on current Irish and UK market rates.

Material quantities

What your build needs, measured from your drawings.

Risks & gaps

What the drawings leave unclear. The items that become extras later.

Questions for your builder

So every quote you receive is priced on the same scope.

Project analysis
Rear extension · example
Estimate€84k to 96k
Line items44
Risks3
Substructure€11,200
External walls€18,900
Roof€9,700
Windows & doors€14,300
Structural steel€3,400
Internal finishes & services€26,800

Illustrative figures

For contractors, estimators & developers

See what EchoByld finds before you price.

Drawings, bills and specifications read against each other. Quantities, scope gaps and commercial risk, ready for your estimators to review.

Business park site development · ~€1.0m tender
Representative, anonymised
01 · Upload

The full tender pack.

Drawings, bill of quantities, specification and clarification register, in whatever format they arrive.

● Representative example. Details changed for confidentiality
Tender drawingsPDF
Bill of quantitiesPDF / XLSX
Clarification registerPDF

“EchoByld and John handle all our pricing now. We're going in clear on all our projects and winning more work, faster. Our prices land fully measured with the client first. Speed is winning work, and accuracy is helping us make profits.”

DDominicDublin contractor

“The Pro setup is helping us manage delivery on site. We need a fraction of the admin time and it's saving us 10+ hours a week, easily. That's time to focus on delivery instead of measuring and paperwork.”

HHousing developerPro plan
Case studies

Real projects. Real numbers.

Business park site development · Leinster · ~€1.0m tender

A €1.03m groundworks tender, corrected before pricing.

Drawings, bill of quantities and specification read against each other, so the gaps surfaced before a single rate was entered.

+€210kadded to the stated tender base (+20.5%)
€76kpreliminaries priced at a nominal sum
81%scope completeness, with every gap listed
12draft RFIs ready to issue before tender close
PRELIMINARIESHIGH
€18,500 lump sum for a 26 week programmeCorrected allowance of €76,000 built from the documents.
UTILITY DIVERSIONSHIGH
Scope split with the network operator unresolved€29,500 adopted. Confirm the split before pricing.
DRAWING VS BILLCONFLICT
Surfacing specified as SMA on drawing, HRA in the bill€11,880 differential priced and RFI drafted.

Representative example. Names, locations and figures changed to protect client confidentiality.

Project map

Projects across Ireland & the UK

Planning approved and active projects: new builds, extensions, restorations and commercial schemes. Explore what's being built near you.

Who's behind it

Technology first. Engineering judgement behind every report.

EchoByld was founded by John Lawlor, a Chartered Structural Engineer with over a decade across residential, commercial and public-sector projects in Ireland.

The platform does the heavy lifting; the engineering experience is why you can trust what it tells you.

Chartered Structural EngineerSupported by Enterprise IrelandInterTradeIreland Seedcorn 2026, Regional FinalistNational Startup Awards 2026, AI-Focused Startup · National Finalist
More about EchoByld
Questions

Good to know

Start with the problem you have today.

Tell us a little about your project and we'll point you to the right next step: the platform, a conversation, or an engineer.