For contractors, estimators & developers

Price every tender with the gaps already found.

EchoByld reads drawings, bills and specifications against each other. Quantities, scope gaps and commercial risk, ready for your estimators to review and price.

Pro & Enterprise plansMeasured against your own numbersEngineer-led
Business park site development · ~€1.0m tender
Representative, anonymised
01 · Upload

The full tender pack.

Drawings, bill of quantities, specification and clarification register, in whatever format they arrive.

● Representative example. Details changed for confidentiality
Tender drawingsPDF
Bill of quantitiesPDF / XLSX
Clarification registerPDF
Recognised & supported by
Supported by Enterprise Ireland
InterTradeIreland Seedcorn Investor Readiness Competition 2026, Regional Finalist
InterTradeIreland Seedcorn 2026Regional Finalist
The National Startup Awards 2026, AI-Focused Startup, National Finalist
National Startup Awards 2026AI-Focused Startup · National Finalist
Engineers Ireland, Chartered Engineer (CEng)The Institution of Structural Engineers (IStructE)
Chartered engineer ledCEng · IStructE
Platform

Construction intelligence, from first drawing to final account.

Cost estimation

Itemised cost ranges from your documents, on current Irish and UK market rates, with every assumption shown.

Quantity takeoff

Measured and inferred quantities, clearly labelled with confidence.

Risk intelligence

Nominal-priced items, unresolved scope and document conflicts, ranked by value.

Tender preparation

Scope, quantities and draft RFIs packaged for pricing.

Quote appraisal Coming soon

Independent comparison of subcontractor quotations on one scope.

Commercial control

Track cost against plan across your projects, for Pro and Enterprise teams.

Engineering behind it

Chartered structural engineering, temporary works and tender support when a project needs more than software.

Case studies

What the documents didn't say.

Real projects and representative tender reviews, anonymised for client confidentiality.
One builder, eight projects priced in four months. 3D scheme model
3D scheme model
One builder, eight projects priced in four months. Shell
Shell
One builder, eight projects priced in four months. Complete
Complete
Builder partner · Extensions & retrofits · Dublin & Kildare

One builder, eight projects priced in four months.

A growing residential contractor uses EchoByld to cost plan, de-risk and win its pipeline, from compact terraced extensions to a whole house retrofit. Where homeowners awarded the build through EchoByld, the same chartered engineer certified the work.

€1.39mof residential work cost planned for one builder (8 projects, May to Aug 2026)
+19%floor area missing from an architect's tender schedule, caught before pricing
2.5%final certified cost against the EchoByld cost plan on a completed closed loop extension
The challenge
A growing Dublin builder was pricing everything from small ICF extensions to deep retrofits with steel frames, heat pumps and occupied house phasing. Estimating time was the bottleneck, and the tender packs it received were not always right.
What EchoByld did
Platform takeoffs turned drawings into trade by trade contractor cost reports, with provisional sums and risk allowances, plus a plain English cost plan the builder could share with the homeowner. On one architect led tender, EchoByld re-measured the drawings: the schedule understated the floor area by 29 m² (19%), so the builder could qualify its price instead of absorbing the loss. Where the homeowner awarded the contract, EchoByld stayed on as chartered structural engineer for inspections, lender stage certificates and the final Opinion on Compliance.
The outcome
Eight projects cost planned in four months. The first completed closed loop extension was certified at €128,162 against a €125,000 plan, with nothing outstanding at handover.
Business park site development · Leinster · ~€1.0m tender

A €1.03m groundworks tender, corrected before pricing.

Drawings, bill of quantities and specification read against each other, so the gaps surfaced before a single rate was entered.

+€210kadded to the stated tender base (+20.5%)
€76kpreliminaries priced at a nominal sum
81%scope completeness, with every gap listed
12draft RFIs ready to issue before tender close
PRELIMINARIESHIGH
€18,500 lump sum for a 26 week programmeCorrected allowance of €76,000 built from the documents.
UTILITY DIVERSIONSHIGH
Scope split with the network operator unresolved€29,500 adopted. Confirm the split before pricing.
DRAWING VS BILLCONFLICT
Surfacing specified as SMA on drawing, HRA in the bill€11,880 differential priced and RFI drafted.

Representative example. Names, locations and figures changed to protect client confidentiality.

Cover of an EchoByld sample report extract
Sample report extract · Groundworks

See exactly what an EchoByld report contains.

Executive summary, costed risk register with proposed corrections, and an ARM4 / NRM2 style bill of quantities extract from the same site development tender.

6pages from a full report
10costed risks with corrections
54measured BoQ lines, tagged by confidence
12draft RFIs

Sample extract. Project, client, drawings, quantities and rates are fictional, for illustration only.

What our clients say

Pricing faster. Delivering with less admin.

“EchoByld and John handle all our pricing now. We're going in clear on all our projects and winning more work, faster. Our prices land fully measured with the client first. Speed is winning work, and accuracy is helping us make profits.”

DDominicDublin contractor

“The Pro setup is helping us manage delivery on site. We need a fraction of the admin time and it's saving us 10+ hours a week, easily. That's time to focus on delivery instead of measuring and paperwork.”

HHousing developerPro plan
For contractors & developers

Send us a past project. We'll show you what we'd have found.

Before we talk, share a tender you've already priced or built. We'll run it through EchoByld and bring the findings to the call, measured against your own numbers.

01Tell us about your team in 3 quick questions
02Upload the drawings, bill or tender pack
03Pick a time that suits you
04We bring the findings to the call
Plans

Start where your team is today.

Pro for estimating teams and SME contractors. Enterprise for developers and main contractors running multiple schemes.

For estimating teamsPro

Pro

For SME contractors, estimators & QS teams

Tailored
  • Takeoff & gap checks on every tender
  • Tender preparation support
  • Guided setup around your workflow
  • Ongoing commercial intelligence
Book a discussion
Enterprise

Enterprise

For developers & main contractors

Tailored
  • Start with one live scheme
  • Measured against your own takeoff
  • Your formats, rates & packages
  • Commercial control across projects
Book a discussion
Project

Project Analysis

For homeowners & self-builders

€450 / project
  • Cost estimate & quantities
  • Risk & gap report
  • 24 hour turnaround
  • Engineer reviewed
Start my analysis
Engineering

Engineering Services

Planning, structural, grants & inspections

Quoted
  • Planning & design support
  • Structural design & certification
  • Vacant & derelict grants
  • Pre-purchase inspections
Enquire
Project map

Projects across Ireland & the UK

Planning approved and active projects: new builds, extensions, restorations and commercial schemes. Explore what's being built near you.

Start with the problem you have today.

Tell us a little about your project and we'll point you to the right next step: the platform, a conversation, or an engineer.